Place of Origin: | China |
Brand Name: | Alustar |
Certification: | TUV, SAA, CB ,CE FC ERP Full series |
Model Number: | ALS-CEI15-34 |
Minimum Order Quantity: | 100 pcs |
---|---|
Price: | negotiation |
Packaging Details: | seaworthy export packing |
Delivery Time: | 5-8 days for sample, and the bath production will be about 35 days |
Payment Terms: | Western Union, T/T, D/A, L/C, MoneyGram |
Supply Ability: | 2000 pcs per day |
Name: | Led Ceiling Light | Wattage: | 72W |
---|---|---|---|
Lumens: | 5760lm | Input Voltage: | AC100-240V |
LET Q'TY: | SMD4014 | POWER FACTOR: | >0.90 |
Color Temperature: | 3000K/4000K/6000K | Size: | 600*1200*10 |
Luminous Efficieny (lm/w): | 80 | RA: | 80 |
LED Q'TY: | 468pcs | ||
Highlight: | led ceiling lights for homes |
Energy Saving Long Lifespan 600*1200mm 72W LED Panel Ceiling with Aluminum Alloy Shell ALS-CEI15-34
Specification:
POWER |
72w |
Input Voltage |
100-240VAC |
Luminous Flux |
5760lm |
CRI |
80 |
Color Temperature (CCT) |
3000-6000K |
Outline Dimension |
600*1200*10mm |
Product Description
Item No.: |
ALS-CEI-15-34 |
Dimension: |
600*1200*10mm |
Power(W): |
72w |
Luminous: |
5760lm |
Beam angle |
110º |
Material: |
Alu+ PS |
Efficiency: |
80 |
Led brand |
Epistar 4014 |
PF: |
≥0.90 |
CCT |
3000k-6000k |
Input : |
100-240V ,50-60Hz |
CRI |
80 |
Certificate: |
CE,SAA,UL.TUV.etc |
Service: |
OEM and ODM |
Installation:
Ceiling Mounted Installation:
1. Fix the wall frames onto the ceiling and wall by screws.
2. Put the 4 build-in clicks of the lamps on to the screens of the wall frames, and push the lamps forward to the wall frames, clicks will be locked automatically, the installation is completed.
The embedded Installation:
1. After take off the ceilings
2. Complete the installation via exchanging the lamps(make the clicks straight, then put them in the holes of ceilings.
Suspended ceiling Installation:
Integration ceiling Installation:
Attention:
1 Use indoor or some place where no water, don’t put them in wet or dam place
2 Please check the local voltage compliance product requirements
3 Installed in a well-ventilated place to ensure appropriate environmental temperature
4 When installation, try to avoid the minefields, strong magnetic field and high-pressure region
5 Always turn power off at the circuit breaker before rewiring your fixture
Applications:
1. Commercial and exhibition locations
2. Hotel, conference room
3. Factory, office, house
4. Airport, metro station
5. School, hospital and other public places
Maintenance:
1. Pls don’t repair or maintain the product under condition user lack of professional person or knowledge for circuit,especially in absence of necessary equipment, avoiding extending the damage or breaking down the important components.
2. As there is high voltage circuit inside the product, during maintenance pls don’t dissemble or hand touch the PCB under power-on condition. There is isolation protection layer on circuit board, pls don’t touch acidic materials when you disassemble the circuit board, like sweat etc. Please use plate washer water to clean the circuit board when there is stain or dust.
Installation:
Ceiling Mounted Installation:
1. Fix the wall frames onto the ceiling and wall by screws.
2. Put the 4 build-in clicks of the lamps on to the screens of the wall frames, and push the lamps forward to the wall frames, clicks will be locked automatically, the installation is completed.
The embedded Installation:
1. After take off the ceilings
2. Complete the installation via exchanging the lamps(make the clicks straight, then put them in the holes of ceilings.
Suspended ceiling Installation:
1. Connecting the suspended wires with the clicks of the lamp. And put the ceiling plate into the suspended wires, can control the height of the lamps by pulling the suspended chucks.
2. After completed the height controlling, Fixed the 4 suspend chucks on to the ceilings, the installation is completed.
Integration ceiling Installation:
1. Installing the keels shelves, and install the buckles one by one, obligating the place for the lamps.
2. Connecting the electrical cables, put the lamps into the keels shelves.
Contact Person: Mr. zhang
Tel: 18810166789
Fax: 86-198-3344-3222